Memorandum of Understanding (MoU) – Kay Pee Transformers Pvt. Ltd.
Last Updated: January 1, 2026
What This MoU Covers
This Memorandum of Understanding (MoU) creates a clear agreement between Kay Pee Transformers Pvt. Ltd. (Supplier) and you (Customer) for transformer manufacturing India projects. First, it defines all terms for transformer india orders from our Kim, Surat factory. Next, it explains the complete process from quote to delivery. As a result, both parties understand rights, responsibilities, and expectations completely.
This MoU applies to all transformers, services, and contracts through kaypeetransformers.com
1. Definitions and Key Terms
Important Words Explained Simply
Agreement: This complete MoU document covering all transformer manufacturer India terms.
Customer: You or your company ordering any type of transformer or services.
Products: All Kay Pee transformers manufactured:
Distribution transformers (10kVA-5000kVA, IS 2026, IS 1180)
Power transformers (1MVA-25MVA)
LT transformers (1kVA-1000kVA)
Control transformers (100VA-10kVA)
Auto transformers (1kVA-1000kVA)
IDT – Inverter duty transformers(Solar, 100kVA-5000kVA)
Services: Non-manufacturing work:
Transformer repair and AMC
Oil testing & filtration services
Rental of Distribution and Power transformers if available in stock
Technical consulting
GA drawings preparation
Supplier: Kay Pee Transformers Pvt. Ltd., Kim, Surat, Gujarat.
Order: Your formal acceptance of our transformer quote after GA drawings approval.
Proposal: Our detailed written offer is valid as per quotation.
Works: Manufacturing following our 9-step process at Kim factory.
2. Quote and Proposal Rules
How Quotes Work:
- We send detailed proposal with all the technical specifications
- Valid as per quotation or discussion from issue date
- Accept entire proposal OR request written changes
- Place formal Order within validity period
- We confirm acceptance by email – production starts
Important Rules:
Full acceptance required (no partial orders)
Written changes only (no verbal agreements)
We reserve right to refuse any Order
Proposal expires after days of mentioned on quotation
3. Products and Services Specifications
Exactly What You Get
All products match Schedule 1 of your approved proposal:
Distribution transformers (10kVA-5000kVA, IS 2026, IS 1180)
Power transformers (1MVA-25MVA)
LT transformers (1kVA-1000kVA)
Control transformers (100VA-10kVA)
Auto transformers (1kVA-1000kVA)
IDT – Inverter duty transformers(Solar, 100kVA-5000kVA)
Any Customised transformers
Change Process:
- Written request within 7 days of Order
- Revised proposal with extra charges
- Your written approval required
- Production updated accordingly
4. Pricing and Payment Terms
GST-Inclusive Transparent Pricing
Payment Structure:
All prices exclude GST
50% advance with Order confirmation
50% balance before dispatch
Price Adjustment Triggers:
GST rate changes after Order date
Customer-requested specification changes
Late Payment Penalties:
RBI reference rate + 8% annual interest
Legal recovery costs added
Title remains with Kay Pee until full payment
5. Delivery and Risk Transfer
Realistic Timelines
Delivery Follows 9-Step Process:
Gujarat Local: 3-5 working weeks
India-wide: 5-6 working weeks
Export: 6 – 8 weeks (FOB port)
Risk Transfer Rules:
Risk passes on delivery to your site
Inspect within 7 days for defects
Notify in writing immediately
No liability for transit delays & damage
6. Inspection Requirements
Customer Must Verify
Upon Delivery Check:
Physical damage to tank/radiators
Nameplate matches GA drawings
Tap Switch operate smoothly
Oil level correct (if filled)
Accessories complete
7-Day Notification Period: Defects must be reported in writing.
7. Supplier Obligations
What Kay Pee Guarantees
Manufacturing Standards:
Skilled workmanship throughout
Health & safety compliance
Public liability insurance coverage
BIS IS 1180/IS 2026 standards (certified products)
Proper waste disposal
Quality Commitment:
Efficiency verified as per Quotation
All testing per Indian standards
GA drawings match final product
12-month warranty provided
8. Customer Obligations
Your Responsibilities
Before Production:
Approve GA drawings within 5 days
Provide accurate site details
Confirm specifications in writing
During Delivery:
Provide site access (15ft minimum)
Arrange unloading equipment
Proper foundation per per drawings
Certified electrician present
9. Warranty and Guarantees
12-Month Factory Protection
Coverage Includes:
Manufacturing defects only
Poor Workmanship
Tap switch malfunctions
only repair/replacement at factory
Exclusions:
Overload/misuse
Improper installation
External damage
Normal wear and tear
10. Cancellation Rights
Cooling-Off Period
7 days from Order confirmation
Full refund (no production started)
Written cancellation required
After production: No refunds
11. Termination Conditions
When Agreement Ends
Either party can terminate if:
Serious breach
Payment default
Bankruptcy/insolvency
Force majeure exceeds 60 days
12. Force Majeure Protection
Excused Performance Includes
Gujarat monsoons
Raw material supply shortages
Factory power failures
Government restrictions
60-day grace period applies
13. Dispute Resolution Process
Step-by-Step Resolution
- Contact General Manager (15 days)
- Written negotiation (7 days)
- Surat arbitration if unresolved
- Continue services during process
14. Governing Law
Indian Law with exclusive Surat court jurisdiction.
15. Contact Information
General Manager
Kay Pee Transformers Pvt. Ltd.
Block No. : 89, Survey No. : 113/2,
Opposite navapara patiya village,
Mota Borsara (Kim), Taluka : Mangrol,
Dist. : Surat, Gujarat 394110
Phone: +91 8487078119
Email: info@kaypeetransformers.com
Website: https://kaypeetransformers.com/memorandum-of-understanding/
Office Hours: Mon-Sat 9 AM – 6 PM IST
Response Time: Within 48 hours for all privacy requests
